Pre-feasibility study of ETP for HPMC production plant at GIDC Dahej

The proposed appropriate effluent treatment scheme along with well designed, adequate effluent treatment units to meet the statuary norms for treated effluent. To estimate the capital and operation costs of the proposed effluent treatment systems.

Owner / Client : KPMG

Download